Santa Clara Golf Marbella finish the repair of the damages caused by floodings
At the beginning of 2012, Santa Clara Golf Marbella has finished the first phase of the job to repair the damages caused last May 19th 2011 by the flooding.
The job has consisted in the reparation of the Siete Revueltas stream that crosses the golf course.
The river banks have been reinforced by placing big rocks, the buggy paths have been rebuilt and the river bed has been cleaned, among other small repairs caused by the water strength.
| BEFORE | NOW |







