Santa Clara Golf Marbella starts the reparation of the buggy paths

 

Santa Clara Golf Marbella

Santa Clara Golf Marbella has started the reparation of the buggy paths, destroyed by the flooding that hit the Club last May 19th.

The mud and water flood caused the damage of part of the buggy paths placed beside to the Siete Revueltas stream.

The building of a new breakwater made with big rocks was needed to build on top of it the concrete buggy path.

The jobs are planned to be finish in two weeks time, before the rainy season starts.

 

Santa Clara Golf Marbella

 

 

 

 

 

 

 

2016 (c) Santa Clara Golf Marbella - Ctra. N-340 Km. 187.5 29603 - Marbella - Golf in Spain